
The Orihuela City Council’s Department of Infrastructure has unveiled the great renovation plan for the Ingeniero Juan García Park, a long-awaited challenge set to utterly remodel this 11,000 m² “inexperienced lung” within the city heart.
Key Details
- Investment: €500,000, absolutely funded by the Generalitat Valenciana (Valencian regional authorities).
- Goal: To improve performance, improve enchantment, and adapt the park to satisfy the wants of all customers, together with younger households, seniors, athletes, and pet homeowners.
- Timeline: The challenge is anticipated to have an execution interval of six months as soon as work begins. The metropolis council has already met the preliminary deadline by justifying the primary required expenditure for the challenge’s drafting. The intention is to tender the works in 2025 and begin development as quickly as potential, with completion hoped for after the summer time.
Planned Improvements
The overhaul is in depth, masking each space of the park:
| Area | Planned Action |
| Sports Zone | Integral remodelling of the multi-sport courtroom, set up of a prefabricated concrete grandstand, perimeter protecting nets, and whole renewal of the sports activities pavement. |
| Family/Play Areas | Installation of new, absolutely renovated kids’s video games, a zip line, renewal of rubber flooring, and improved accessibility all through the realm. |
| New Features | Introduction of dry fountains with water jets (a brand new attraction for the municipality) and a devoted canine park with acceptable tools. |
| Rest/Social Areas | Renewal of benches, shaded areas, and resting areas, together with the reorganization of paths and paved zones. |
| Gardening/Irrigation | Complete renewal of the park’s landscaping, set up of a contemporary drip irrigation system, and enchancment of floor surfaces. |
| Public Lighting | Total substitute of public lighting with new, extra highly effective, and environment friendly luminaires. |
The Mayor, Pepe Vegara, and Councillor for Infrastructure, Víctor Valverde, highlighted the dedication to shortly processing the challenge to safe the regional funding and expressed their certainty that the renovated park will turn out to be a benchmark for leisure and neighborhood well-being in Orihuela.
